2021 Energy Saving Measure Energy Saving Amount (kWh) Carbon Reduction (tons CO2e)
Taoyuan Plant established the chiller system energy control indicator, performed system running data collection and analysis, and adjusted chilled water consumption 110,112 55.28
Cleanroom FFU fan motor changed from AC to DC 60,685 30.46
Replaced lighting fixtures in all plant sites with LED lights 34,036 17.09
Longtan Tech Plant reduced pressure difference of pipelines of pure water pipes/air conditioning hot water pipes/chilled water pipes, etc., in order to reduce pump running frequency 150,450 75.53
Longtan Tech Plant installed new MAU and used low-energy consumption wet film board for humidification 390,920 196.24
Yunlin Tech Plant air compression system with replacement of energy consumption equipment 33,155 16.64
Self-installed solar energy generation facility (Yunlin Tech Plant/Suzhou Plant) 1,379,200 692.36
Total Energy Saved Amount 2,158,558 1,083.60

Note: Reduction scope refers to Scope 2.
 
2021 Energy Saving Measure Energy Saving Amount (kWh) Carbon Reduction (tons CO2e)
Taoyuan Plant RTO waste heat recycling improvement project 222,482 418.04
Wuhu Plant furnace low-nitrogen modification 30,326 56.98
Total Energy Saved Amount 252,808 475.02

Note: Reduction scope refers to Scope 1.
Note 2: All measures have been converted into the energy saving amount under normal use throughout the year.


 
Plant Power Generation Capacity (MW) Power Generation in 2021 (kWh)
Yunlin Tech Plant 0.29 270,324
Suzhou Plant 1.4 1,108,876

 

keyword search

Please Enable cookies to improve your user experience